PPM schedule¶
Planned preventive maintenance (PPM) keeps equipment safe and reliable. EquipNet schedules it automatically from each device's last service date and service frequency.
Who can do this: Superadmin Department Head (view & export) · Internal biomeds plan and do the work — see PPM planner.
How PPM is scheduled¶
- Each device's next PPM date = last service date + service frequency (months).
- When it's due, EquipNet automatically creates a Preventive Maintenance service request. If an engineer was assigned in the planner, it goes straight to them. Parts planned for it are reserved from stock, and missing ones go to procurement (see Spare parts).
- When the job is completed, the last service date updates and the cycle repeats.
Nothing scheduled?
Equipment without a last service date or frequency appears under Unscheduled Assets. Fill them in there (direct link) and select Save.
View the schedule¶
Open PPM Schedule (sidebar → Assets & Maintenance). Tabs:
| Tab | Shows |
|---|---|
| Schedule | Upcoming PPM by month and department, with who is assigned and the parts needed (ticket rows show the parts reserved or used on the ticket). |
| Unscheduled Assets | Equipment missing PPM data. |
| Signed Schedule Uploads | Signed-off paper schedules. |
Pick the period from the Schedule period dropdown (All dates, This month, Next quarter, Next 12 months, or Custom range with From/To dates) and select Apply. The Schedule list shows only PPM due in the selected period. The tiles above it filter the list — select one to see just those items, or In {period} to go back to the full period:
| Tile | Counts |
|---|---|
| In {period} | Everything due in the period that isn't overdue. |
| Completed / Active / Scheduled | Period items with that status. |
| Overdue / Missed | Every overdue or missed PPM, whatever its due date ("all dates"), so it can be larger than the period. |
Exports follow what's on screen: select Overdue / Missed first to export the backlog.
Department Heads see only their departments. PPM History lists completed PPM.
Export and sign off¶
- Department Schedule (PDF) — print for sign-off.
- Aggregated Inventory List (Excel) — for planning and budgeting.
- Upload Signed PPM Schedule — upload the signed copy under Signed Schedule Uploads. Use Supersede to replace it with a newer version.